SNOW ROAD over SOUTH RIVER

0.13 MI. RT 153 · County 003, New Hampshire · Built 2021 · 2 Lanes · 157 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
007401650011200
Year Built
2021
Length
16 m (52.5 ft)
Max Span
14 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
157
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.