NH 25 over PINE RIVER

0.6 MI FROM OLD N.H. 16 · County 003, New Hampshire · Built 1963 · 2 Lanes · 5,729 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020401830024600
Year Built
1963
Reconstructed
2005
Length
38.2 m (125.3 ft)
Max Span
18.3 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
5,729
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.