MOULTONVILLE ROAD over DAN HOLE RIVER

1.54 MI N. JCT. 16 · County 003, New Hampshire · Built 1976 · 2 Lanes · 755 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
020401450023600
Year Built
1976
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
755
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.