BUMPS INTERVALE over BEEBE RIVER

80 FT FR PERCH POND RD · County 009, New Hampshire · Built 1877 · 1 Lanes · 96 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
003501630008200
Year Built
1877
Reconstructed
1972
Length
25.6 m (84 ft)
Max Span
18.9 m
Width
4.2 m (13.8 ft)
Lanes
1
Daily Traffic
96
Material
Wood or Timber
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.