I-93 SB over US 3 PEMIGEWASSET RIVER

2.7 MI PLYMOUTH TL · County 009, New Hampshire · Built 1969 · 2 Lanes · 10,052 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

43.81775, -71.66275

This bridge is in worse condition than 52.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
003501210008800
Year Built
1969
Reconstructed
2004
Length
176.5 m (579.1 ft)
Max Span
46.6 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
10,052
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.