I-93 NB over BOG BROOK

1.1 MI FROM PLYMOUTH TL · County 009, New Hampshire · Built 1963 · 2 Lanes · 10,585 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
003501050005800
Year Built
1963
Reconstructed
1992
Length
46.3 m (151.9 ft)
Max Span
17.4 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
10,585
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.