I-93 NB over MAD RIVER

4.4 MI PLYMOUTH TL · County 009, New Hampshire · Built 1968 · 2 Lanes · 10,012 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

43.839111, -71.650561

This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
003501340011500
Year Built
1968
Reconstructed
2002
Length
31.9 m (104.7 ft)
Max Span
30.5 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
10,012
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.