NH 49 over PEMIGEWASSET RIVER

0.25 MI E JCT US 3 · County 009, New Hampshire · Built 1928 · 2 Lanes · 1,917 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 4 Poor
Substructure 5 Fair

Location

43.848058, -71.659925

This bridge is in worse condition than 92.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 98 years old.

Nearby Bridges

Bridge Details

Structure #
003501240012900
Year Built
1928
Length
66.1 m (216.9 ft)
Max Span
32 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
1,917
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.