I-93 NB over OWL STREET

0.7 MI THORNTON TL · County 009, New Hampshire · Built 1968 · 2 Lanes · 7,498 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

43.859642, -71.652161

This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
003501330014500
Year Built
1968
Reconstructed
2002
Length
23.2 m (76.1 ft)
Max Span
21.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
7,498
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.