I-93 NB over PEMIGEWASSET RIVER

0.1 MI CAMPTON TL · County 009, New Hampshire · Built 1969 · 2 Lanes · 7,498 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.867683, -71.664272

This bridge is in worse condition than 17.9% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 57 years old.

Nearby Bridges

Bridge Details

Structure #
025402470008000
Year Built
1969
Reconstructed
2002
Length
124.7 m (409.1 ft)
Max Span
47.2 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
7,498
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.