EASTERN CORNER RD over BEEBE RIVER

2.2MI FR NH ROUTE 175 · County 009, New Hampshire · Built 1920 · 1 Lanes · 96 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 8 Very Good
Substructure 5 Fair

Location

43.817542, -71.597703

This bridge is in worse condition than 77.3% of bridges in County 009. The average bridge in New Hampshire is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
003501850008600
Year Built
1920
Reconstructed
2011
Length
21.3 m (69.9 ft)
Max Span
20.2 m
Width
4 m (13.1 ft)
Lanes
1
Daily Traffic
96
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.