NH101 WB over I-293(RAMP D)
.2 MI JCT RT 3 · County 011, New Hampshire · Built 1959 · 2 Lanes · 24,986 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
42.950067, -71.475136
This bridge is in worse condition than 60.8% of bridges in County 011. The average bridge in New Hampshire is 0 years old; this one is 67 years old.
Nearby Bridges
NH101 EB over US 3
Built 2006
NH101 WB over US 3
Built 2006
I-293 SB OFF RAMP over US 3
Built 2006
NH101 WB over FEE TPK
Built 1993
I-293 EB NH101 EB over FEE TPK
Built 1993
US 3 over FEE TPK
Built 2013
STATION ROAD over CHANDLER BROOK
Built 2007
I-293 NB NH101 WB over MERRIMACK RIVER CSX
Built 1960
I-293 SB NH101 EB over MERRIMACK RIVER CSX
Built 1960
I-293 WB NH101 over NH 3A BROWN AVE
Built 2004
Bridge Details
- Structure #
- 001901840013200
- Year Built
- 1959
- Reconstructed
- 1993
- Length
- 46.6 m (152.9 ft)
- Max Span
- 18.6 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 24,986
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.