I-293 SB OFF RAMP over US 3

NH101/US3/I-293 Intchg · County 011, New Hampshire · Built 2006 · 2 Lanes · 8,021 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001901810013400
Year Built
2006
Length
50.3 m (165 ft)
Max Span
47.9 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
8,021
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.