NH101 WB over US 3

NH101 WB OVER US 3 · County 011, New Hampshire · Built 2006 · 2 Lanes · 24,986 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
001901820013200
Year Built
2006
Length
50 m (164 ft)
Max Span
48.2 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
24,986
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.