I-293 WB NH101 over NH 3A BROWN AVE

1.2MI W JCT RTE 28 · County 011, New Hampshire · Built 2004 · 2 Lanes · 45,058 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016101850007700
Year Built
2004
Length
46.3 m (151.9 ft)
Max Span
45.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
45,058
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.