SR160 PAHRUMP VLY over DRY WASH
MOUNTAIN SPRINGS · County 003, Nevada · Built 1997 · 4 Lanes · 10,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
36.035019, -115.046992
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 29 years old.
Nearby Bridges
STEPHANIE ST. over PITTMAN WASH
Built 1999
WIGWAM PWY over STORM DRAIN
Built 2006
STEPHANIE ST over I 215
Built 1999
I 215 over DRY WASH
Built 1999
I 215 over DRY WASH
Built 1956
PASEO VERDE PWY over CHANNEL
Built 2004
ARROYO GRANDE BL over I 215
Built 1999
ARROYO GRANDE over CHANNEL
Built 1999
ARROYO GRANDE BL over DRY WASH
Built 1997
ARROYO GRANDE BLVD over PITTMAN WASH
Built 1994
Bridge Details
- Structure #
- M2061B
- Year Built
- 1997
- Length
- 6.3 m (20.7 ft)
- Max Span
- 1.3 m
- Lanes
- 4
- Daily Traffic
- 10,000
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $203,000
- Total Project Cost
- $305,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.