I 215 over DRY WASH
HENDERSON · County 003, Nevada · Built 1999 · 8 Lanes · 140,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
36.029631, -115.043069
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 27 years old.
Nearby Bridges
STEPHANIE ST over I 215
Built 1999
SR160 PAHRUMP VLY over DRY WASH
Built 1997
I 215 over DRY WASH
Built 1956
PASEO VERDE PWY over CHANNEL
Built 2004
WIGWAM PWY over STORM DRAIN
Built 2006
LAS PALMAS ENTRADA over GIBSON CHANNEL
Built 1998
STEPHANIE ST. over PITTMAN WASH
Built 1999
ARROYO GRANDE BL over I 215
Built 1999
ARROYO GRANDE over CHANNEL
Built 1999
I 215 over GIBSON RD
Built 2005
Bridge Details
- Structure #
- B2121
- Year Built
- 1999
- Length
- 7.8 m (25.6 ft)
- Max Span
- 3.6 m
- Lanes
- 8
- Daily Traffic
- 140,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.