ARROYO GRANDE over CHANNEL
HENDERSON · County 003, Nevada · Built 1999 · 4 Lanes · 5,900 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
36.028142, -115.056075
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 27 years old.
Nearby Bridges
ARROYO GRANDE BL over I 215
Built 1999
I 215 over DRY WASH
Built 1956
PASEO VERDE PWY over CHANNEL
Built 2004
ARROYO GRANDE BL over DRY WASH
Built 1997
VALLE VERDE DR over I 215
Built 1999
VALLE VERDE over CHANNEL
Built 1999
WIGWAM PWY over STORM DRAIN
Built 2006
ARROYO GRANDE BL over DRY WASH
Built 1997
STEPHANIE ST over I 215
Built 1999
ASPEN BAY LN over LOWER PITTMAN WASH
Built 2012
Bridge Details
- Structure #
- B2122
- Year Built
- 1999
- Length
- 7.5 m (24.6 ft)
- Max Span
- 3.6 m
- Lanes
- 4
- Daily Traffic
- 5,900
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.