STEPHANIE ST over I 215
HENDERSON · County 003, Nevada · Built 1999 · 9 Lanes · 39,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
36.029433, -115.047219
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 27 years old.
Nearby Bridges
I 215 over DRY WASH
Built 1999
I 215 over DRY WASH
Built 1956
PASEO VERDE PWY over CHANNEL
Built 2004
WIGWAM PWY over STORM DRAIN
Built 2006
SR160 PAHRUMP VLY over DRY WASH
Built 1997
ARROYO GRANDE BL over I 215
Built 1999
ARROYO GRANDE over CHANNEL
Built 1999
ARROYO GRANDE BL over DRY WASH
Built 1997
STEPHANIE ST. over PITTMAN WASH
Built 1999
ARROYO GRANDE BL over DRY WASH
Built 1997
Bridge Details
- Structure #
- I1960
- Year Built
- 1999
- Length
- 77.4 m (253.9 ft)
- Max Span
- 39.9 m
- Width
- 41.4 m (135.8 ft)
- Lanes
- 9
- Daily Traffic
- 39,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.