RMP I 580S TO RTIA over I 580 TERMINAL WY

RENO · County 031, Nevada · Built 1988 · 1 Lanes · 2,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I1774
Year Built
1988
Length
164.6 m (540 ft)
Max Span
45.7 m
Width
9 m (29.5 ft)
Lanes
1
Daily Traffic
2,450
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.