I580 US395 over Mill Street

1/2mi N of Vassar 1/2mi · County 031, Nevada · Built 2022 · 5 Lanes · 81,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
I1252S
Year Built
2022
Length
58.1 m (190.6 ft)
Max Span
58.1 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
81,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.