I 580 over VASSAR ST

3/4mi N of Plumb 3/4mi S · County 031, Nevada · Built 1977 · 10 Lanes · 170,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H1251
Year Built
1977
Length
36.5 m (119.8 ft)
Max Span
35.1 m
Width
60.8 m (199.5 ft)
Lanes
10
Daily Traffic
170,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.