I580S Off-Rmp Mill over E2nd St On-Ramp to I580S

SBX · County 031, Nevada · Built 2023 · 1 Lanes · 8,650 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
H3269
Year Built
2023
Length
11.6 m (38.1 ft)
Max Span
8.5 m
Width
8.3 m (27.2 ft)
Lanes
1
Daily Traffic
8,650
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.