DEPARTURES CURB over SOUTH BAGGAGE TUNNEL
MCCARRAN AIRPORT · County 003, Nevada · Built 1998 · 4 Lanes · 10,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.083983, -115.149006
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 28 years old.
Nearby Bridges
GARAGE EXIT ROAD over PARKING EXIT ROAD
Built 1997
DEPARTURES CURB over SOUTH BAGGAGE TUNNEL
Built 1998
GARAGE EXIT ROAD over GARAGE EXIT ROAD
Built 1996
DEPARTURES CURB over NORTH BAGGAGE TUNNEL
Built 1998
ARRIVALS CURB 2 over PLAZA DRIVE
Built 1983
EXPRESS NORTH BRID over PLAZA DRIVE
Built 1996
DAILY BRIDGE over PLAZA DRIVE
Built 1996
BAGGAGE CLAIM N. over PLAZA DRIVE
Built 1996
EXIT TO SWENSON ST over EXIT TO PARADISE RD
Built 1985
ACCESS ROAD TO T3 over ACCESS ROAD
Built 2012
Bridge Details
- Structure #
- H3052
- Year Built
- 1998
- Length
- 6.7 m (22 ft)
- Max Span
- 6.7 m
- Width
- 35.1 m (115.2 ft)
- Lanes
- 4
- Daily Traffic
- 10,000
- Material
- Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.