DEPARTURES CURB over SOUTH BAGGAGE TUNNEL

MCCARRAN AIRPORT · County 003, Nevada · Built 1998 · 5 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H3017
Year Built
1998
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
158.5 m (520 ft)
Lanes
5
Daily Traffic
10,000
Material
Concrete
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.