ARRIVALS CURB 2 over PLAZA DRIVE
MCCARRAN AIRPORT · County 003, Nevada · Built 1983 · 4 Lanes · 6,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 8 | Very Good |
Location
36.087006, -115.149261
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 43 years old.
Nearby Bridges
EXPRESS NORTH BRID over PLAZA DRIVE
Built 1996
DEPARTURES CURB over NORTH BAGGAGE TUNNEL
Built 1998
DAILY BRIDGE over PLAZA DRIVE
Built 1996
BAGGAGE CLAIM N. over PLAZA DRIVE
Built 1996
GARAGE EXIT ROAD over PARKING EXIT ROAD
Built 1997
GARAGE EXIT ROAD over GARAGE EXIT ROAD
Built 1996
DEPARTURES CURB over SOUTH BAGGAGE TUNNEL
Built 1998
PARADISE RD over RUSSELL RD
Built 1994
DEPARTURES CURB over SOUTH BAGGAGE TUNNEL
Built 1998
AIRPORT SERVICE DR over AIRPORT SERVICE DR
Built 1985
Bridge Details
- Structure #
- H3016
- Year Built
- 1983
- Length
- 65.5 m (214.9 ft)
- Max Span
- 19.8 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 4
- Daily Traffic
- 6,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.