DAILY BRIDGE over PLAZA DRIVE
MCCARRAN AIRPORT · County 003, Nevada · Built 1996 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
36.087361, -115.148719
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 30 years old.
Nearby Bridges
BAGGAGE CLAIM N. over PLAZA DRIVE
Built 1996
EXPRESS NORTH BRID over PLAZA DRIVE
Built 1996
ARRIVALS CURB 2 over PLAZA DRIVE
Built 1983
DEPARTURES CURB over NORTH BAGGAGE TUNNEL
Built 1998
GARAGE EXIT ROAD over GARAGE EXIT ROAD
Built 1996
GARAGE EXIT ROAD over PARKING EXIT ROAD
Built 1997
PARADISE RD over RUSSELL RD
Built 1994
DEPARTURES CURB over SOUTH BAGGAGE TUNNEL
Built 1998
RUSSELL RD over FUTURE AIRPORT ACCESS RD
Built 2007
AIRPORT SERVICE DR over AIRPORT SERVICE DR
Built 1985
Bridge Details
- Structure #
- H3014
- Year Built
- 1996
- Length
- 77.4 m (253.9 ft)
- Max Span
- 25 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.