HUDSON WY over WEST WALKER RVR
EAST OF SMITH · County 019, Nevada · Built 1985 · 2 Lanes · 49 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.839125, -119.27515
This bridge is in worse condition than 61.1% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 41 years old.
Nearby Bridges
SR 824 DAY LN over WEST WALKER RVR
Built 1960
SR 208 TOPAZ RD over W WALKER RVR WILSON C
Built 1959
SR 208/TOPAZ RD over W. WALKER RIVER OVERFLOW
Built 1931
SR 208/TOPAZ RD over WEST WALKER RIVER
Built 1931
NORDYKE RD over WEST FORK WALKER RVR
Built 1978
NORDYKE ROAD over EAST FORK WALKER RIVER
Built 2016
SNYDER LN over WALKER RVR
Built 1984
SR338 SWEETWATER over SARONI CANAL
Built 1946
SR208 TOPAZ RD over EAST WALKER RVR
Built 1930
TUNGSTEN RD over HUMBOLDT RVR
Built 2001
Bridge Details
- Structure #
- B1612
- Year Built
- 1985
- Length
- 25 m (82 ft)
- Max Span
- 24.4 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 49
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $408,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.