SR 824 DAY LN over WEST WALKER RVR
NORTH OF SMITH · County 019, Nevada · Built 1960 · 2 Lanes · 820 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.823228, -119.328603
This bridge is in worse condition than 37% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 66 years old.
Nearby Bridges
HUDSON WY over WEST WALKER RVR
Built 1985
SR 208/TOPAZ RD over SIMPSON CANAL
Built 1955
SR 208/TOPAZ RD over WEST WALKER RIVER
Built 1934
TUNGSTEN RD over HUMBOLDT RVR
Built 2001
SR338 SWEETWATER over SARONI CANAL
Built 1946
SR 208 TOPAZ RD over W WALKER RVR WILSON C
Built 1959
SR829 WELLINGTON over SARONI CANAL
Built 1946
SR 208/TOPAZ RD over W. WALKER RIVER OVERFLOW
Built 1931
SR 208/TOPAZ RD over WEST WALKER RIVER
Built 1931
NORDYKE RD over WEST FORK WALKER RVR
Built 1978
Bridge Details
- Structure #
- B 822
- Year Built
- 1960
- Length
- 28.3 m (92.8 ft)
- Max Span
- 10.7 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 820
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $301,000
- Total Project Cost
- $452,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.