SR 208 TOPAZ RD over W WALKER RVR WILSON C
EAST OF SMITH · County 019, Nevada · Built 1959 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.809136, -119.2209
This bridge is in worse condition than 61.1% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 67 years old.
Nearby Bridges
SR 208/TOPAZ RD over W. WALKER RIVER OVERFLOW
Built 1931
SR 208/TOPAZ RD over WEST WALKER RIVER
Built 1931
HUDSON WY over WEST WALKER RVR
Built 1985
SR 824 DAY LN over WEST WALKER RVR
Built 1960
NORDYKE RD over WEST FORK WALKER RVR
Built 1978
NORDYKE ROAD over EAST FORK WALKER RIVER
Built 2016
SR208 TOPAZ RD over EAST WALKER RVR
Built 1930
SR338 SWEETWATER over SARONI CANAL
Built 1946
SNYDER LN over WALKER RVR
Built 1984
Minister Road over E Fork Walker River
Built 2020
Bridge Details
- Structure #
- B 778
- Year Built
- 1959
- Length
- 37.5 m (123 ft)
- Max Span
- 14.6 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.