SR208 TOPAZ RD over EAST WALKER RVR
SOUTH OF YERINGTON · County 019, Nevada · Built 1930 · 2 Lanes · 390 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
38.877461, -119.144814
This bridge is in worse condition than 61.1% of bridges in County 019. The average bridge in Nevada is 0 years old; this one is 96 years old.
Nearby Bridges
NORDYKE ROAD over EAST FORK WALKER RIVER
Built 2016
NORDYKE RD over WEST FORK WALKER RVR
Built 1978
SR 208/TOPAZ RD over WEST WALKER RIVER
Built 1931
SNYDER LN over WALKER RVR
Built 1984
SR 208/TOPAZ RD over W. WALKER RIVER OVERFLOW
Built 1931
Minister Road over E Fork Walker River
Built 2020
SR 827 over WALKER RVR
Built 1969
SR 208 TOPAZ RD over W WALKER RVR WILSON C
Built 1959
HUDSON WY over WEST WALKER RVR
Built 1985
SR 340 BRIDGE ST over WALKER RVR
Built 1974
Bridge Details
- Structure #
- B 144
- Year Built
- 1930
- Reconstructed
- 1958
- Length
- 19.5 m (64 ft)
- Max Span
- 9.1 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 390
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $219,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.