GOWER ROAD over COLDWATER RIVER
UNION TWP SEC 10-15 · County 023, Michigan · Built 1900 · 2 Lanes · 111 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
2
Critical
Superstructure
2
Critical
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 2 | Critical |
| Superstructure | 2 | Critical |
| Substructure | 5 | Fair |
Location
42.043289, -85.116192
This bridge is in worse condition than 98.3% of bridges in County 023. The average bridge in Michigan is 0 years old; this one is 126 years old.
Nearby Bridges
CLAY ROAD over UNION DRAIN #2
Built 2023
GIRARD ROAD over COLDWATER RIVER
Built 1971
HAYNER ROAD over UNION & TEKONSHA DRAIN
Built 2002
UNION CITY ROAD over COLDWATER RIVER
Built 1955
BROADWAY STREET over ST JOSEPH RIVER
Built 1978
PARK STREET over ST JOSEPH RIVER
Built 1975
STANCER ROAD over STANCER DAM SPILLWAY
Built 1920
STANCER ROAD over COLDWATER RIVER
Built 1905
ARBOGAST ROAD over ST JOSEPH RIVER
Built 2016
9 MILE ROAD over ST JOSEPH RIVER
Built 1968
Bridge Details
- Structure #
- 000000000001179
- Year Built
- 1900
- Length
- 24.7 m (81 ft)
- Max Span
- 23.7 m
- Width
- 4.1 m (13.5 ft)
- Lanes
- 2
- Daily Traffic
- 111
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $240,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.