ARBOGAST ROAD over ST JOSEPH RIVER
UNION TWP SEC 5-6 · County 023, Michigan · Built 2016 · 2 Lanes · 1,180 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.063342, -85.158203
This bridge is in worse condition than 21.2% of bridges in County 023. The average bridge in Michigan is 0 years old; this one is 10 years old.
Nearby Bridges
PARK STREET over ST JOSEPH RIVER
Built 1975
BROADWAY STREET over ST JOSEPH RIVER
Built 1978
UNION CITY ROAD over COLDWATER RIVER
Built 1955
9 MILE ROAD over ST JOSEPH RIVER
Built 1968
GOWER ROAD over COLDWATER RIVER
Built 1900
GIRARD ROAD over BUELL DRAIN #10
Built 1989
CLAY ROAD over UNION DRAIN #2
Built 2023
RILEY ROAD over ST JOSEPH RIVER
Built 1978
HAYNER ROAD over UNION & TEKONSHA DRAIN
Built 2002
5 MILE ROAD over NOTTAWA CREEK
Built 1922
Bridge Details
- Structure #
- 000000000001143
- Year Built
- 2016
- Length
- 57.3 m (188 ft)
- Max Span
- 19.1 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,180
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $460,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.