PARK STREET over ST JOSEPH RIVER
IN VILLAGE OF UNION CITY · County 023, Michigan · Built 1975 · 2 Lanes · 1,800 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.065014, -85.139128
This bridge is in worse condition than 62.7% of bridges in County 023. The average bridge in Michigan is 0 years old; this one is 51 years old.
Nearby Bridges
BROADWAY STREET over ST JOSEPH RIVER
Built 1978
UNION CITY ROAD over COLDWATER RIVER
Built 1955
ARBOGAST ROAD over ST JOSEPH RIVER
Built 2016
9 MILE ROAD over ST JOSEPH RIVER
Built 1968
GOWER ROAD over COLDWATER RIVER
Built 1900
CLAY ROAD over UNION DRAIN #2
Built 2023
HAYNER ROAD over UNION & TEKONSHA DRAIN
Built 2002
10 1/2 MILE ROAD over ST JOSEPH RIVER
Built 1986
GIRARD ROAD over COLDWATER RIVER
Built 1971
GIRARD ROAD over BUELL DRAIN #10
Built 1989
Bridge Details
- Structure #
- 000000000001188
- Year Built
- 1975
- Length
- 40.5 m (132.9 ft)
- Max Span
- 16.7 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $200,000,000
- Total Project Cost
- $250,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.