STANCER ROAD over STANCER DAM SPILLWAY

UNION TWP SEC 23 · County 023, Michigan · Built 1920 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
000000000001177
Year Built
1920
Reconstructed
2007
Length
9.1 m (29.9 ft)
Max Span
4.2 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
100
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000
Total Project Cost
$236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.