I 195 RAMP A over I 195

195 WB RAMP TO 88SB · County 005, Massachusetts · Built 1964 · 1 Lanes · 2,835 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W300323UCDOTNBI
Year Built
1964
Length
79.6 m (261.2 ft)
Max Span
23.2 m
Width
8.6 m (28.2 ft)
Lanes
1
Daily Traffic
2,835
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,467,000
Total Project Cost
$6,701,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.