ST 88 NB over I 195

.6 MI N OF US 6 · County 005, Massachusetts · Built 1964 · 2 Lanes · 8,293 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

41.673467, -71.090408

This bridge is in worse condition than 58.7% of bridges in County 005. The average bridge in Massachusetts is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
W300263WBDOTNBI
Year Built
1964
Length
76.2 m (250 ft)
Max Span
19.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
8,293
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,199,000
Total Project Cost
$7,799,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.