HWY SUMMIT HILL over RR CSX

@UPPER VALLEY RD RR137.36 · County 003, Massachusetts · Built 1910 · 1 Lanes · 387 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
W090060EADOT634
Year Built
1910
Reconstructed
2017
Length
18.6 m (61 ft)
Max Span
17 m
Width
5.6 m (18.4 ft)
Lanes
1
Daily Traffic
387
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.