ST 1 A/MAIN ST over HWY PRISON ACCESS RD

.6 MI SW OF WINTER ST · County 021, Massachusetts · Built 1952 · 2 Lanes · 9,857 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W030303M8DOTNBI
Year Built
1952
Length
6.9 m (22.6 ft)
Max Span
6.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
9,857
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$737,000
Total Project Cost
$1,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.