ST 1 A/MAIN ST over HWY PRISON ACCESS RD
.6 MI SW OF WINTER ST · County 021, Massachusetts · Built 1952 · 2 Lanes · 9,857 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.105633, -71.286958
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 74 years old.
Nearby Bridges
US 1 NB/WASHNGTON over HWY NORTH ENTRANCE DR
Built 2002
US 1 WASHNGTON ST over RR MACRR
Built 1995
HWY RAMP A over US 1 WASHINGTON ST
Built 2002
HWY MAIN ST over WATER STOP RIVER
Built 1997
US 1 WASHNGTON ST over ST140 PIERCE ST
Built 1995
HWY WEST ST over RR MBTA/CSX
Built 1991
HWY SOUTH ST over WATER NEPONSET RIVER
Built 1875
HWY MAIN ST over RR MBTA/CSX
Built 1987
HWY WEST ST over RR MBTA/CSX
Built 1991
ST 1 A/MAIN ST over RR MBTA/CSX
Built 1955
Bridge Details
- Structure #
- W030303M8DOTNBI
- Year Built
- 1952
- Length
- 6.9 m (22.6 ft)
- Max Span
- 6.1 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 9,857
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $737,000
- Total Project Cost
- $1,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.