HWY MAIN ST over WATER STOP RIVER

1.5 MI W OF RTE 1 A · County 021, Massachusetts · Built 1997 · 2 Lanes · 5,043 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N130133LKMUNNBI
Year Built
1997
Length
12.8 m (42 ft)
Max Span
11.6 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
5,043
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,236,000
Total Project Cost
$1,855,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.