HWY MAIN ST over RR MBTA/CSX

.3 MI W OF ST115 · County 021, Massachusetts · Built 1987 · 2 Lanes · 12,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N1300340KDOT634
Year Built
1987
Length
22.3 m (73.2 ft)
Max Span
21.3 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
12,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,162,000
Total Project Cost
$3,244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.