US 1 WASHNGTON ST over ST140 PIERCE ST
.1 MI S JCT US 1 & PINE · County 021, Massachusetts · Built 1995 · 4 Lanes · 33,143 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.079106, -71.282531
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 31 years old.
Nearby Bridges
HWY RAMP A over US 1 WASHINGTON ST
Built 2002
US 1 NB/WASHNGTON over HWY NORTH ENTRANCE DR
Built 2002
US 1 WASHNGTON ST over RR MACRR
Built 1995
ST 1 A/MAIN ST over HWY PRISON ACCESS RD
Built 1952
ST 1 A/DEDHAM ST over RR PCRR (ABANDONED)
Built 1890
I 95 SB over HWY COCASSET ST
Built 1963
I 95 NB over HWY COCASSET ST
Built 1963
I 95 SB over RR MACRR
Built 1963
I 95 SB over HWY CENTRAL ST
Built 1963
I 95 NB over RR MACRR
Built 1963
Bridge Details
- Structure #
- F060023PLDOTNBI
- Year Built
- 1995
- Length
- 25.9 m (85 ft)
- Max Span
- 24.1 m
- Width
- 31.3 m (102.7 ft)
- Lanes
- 4
- Daily Traffic
- 33,143
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,057,000
- Total Project Cost
- $1,586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.