I 95 SB over RR MACRR

CSX MP QBF 1.77 · County 021, Massachusetts · Built 1963 · 3 Lanes · 51,622 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

42.053192, -71.237169

This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
F060193QTDOTNBI
Year Built
1963
Length
13.4 m (44 ft)
Max Span
12.8 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
51,622
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$699,000
Total Project Cost
$1,049,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.