I 95 NB over RR MACRR
CSX MP QBF 1.67 · County 021, Massachusetts · Built 1963 · 3 Lanes · 51,482 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.052794, -71.236806
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 63 years old.
Nearby Bridges
I 95 SB over RR MACRR
Built 1963
I 95 SB over HWY CENTRAL ST
Built 1963
I 95 NB over HWY CENTRAL ST
Built 1963
I 95 SB over ST140 COMMERCIAL ST
Built 1963
I 95 NB over ST140 COMMERCIAL ST
Built 1963
I 95 SB over HWY COCASSET ST
Built 1963
I 95 NB over HWY COCASSET ST
Built 1963
HWY MANSFLD AVE over HWY N MAIN ST
Built 1954
I 95 NB over ST106 GREEN ST
Built 1963
I 95 SB over ST106 GREEN ST
Built 1963
Bridge Details
- Structure #
- F060193QRDOTNBI
- Year Built
- 1963
- Length
- 12.6 m (41.3 ft)
- Max Span
- 12.1 m
- Width
- 16.1 m (52.8 ft)
- Lanes
- 3
- Daily Traffic
- 51,482
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,359,000
- Total Project Cost
- $2,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.