I 95 NB over RR MACRR

CSX MP QBF 1.67 · County 021, Massachusetts · Built 1963 · 3 Lanes · 51,482 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
F060193QRDOTNBI
Year Built
1963
Length
12.6 m (41.3 ft)
Max Span
12.1 m
Width
16.1 m (52.8 ft)
Lanes
3
Daily Traffic
51,482
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,359,000
Total Project Cost
$2,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.