HWY PLIMPTON ST over WATER NEPONSET RIVER

.3 MI SE OF RTE 1A · County 021, Massachusetts · Built 1925 · 2 Lanes · 5,286 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W030233KDMUNNBI
Year Built
1925
Length
9.1 m (29.9 ft)
Max Span
3.4 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
5,286
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,959,000
Total Project Cost
$2,939,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.