HWY CONEY ST over WATER TRAPHOLE BROOK

.5 MI WEST OF RTE 1 · County 021, Massachusetts · Built 1956 · 2 Lanes · 8,534 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W030313KGMUNNBI
Year Built
1956
Length
7 m (23 ft)
Max Span
6.4 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
8,534
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$674,000
Total Project Cost
$1,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.