ST 27 HIGH PLN ST over I 95 SB

ST 27 AT I 95 SB · County 021, Massachusetts · Built 1963 · 2 Lanes · 8,689 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S090083VPDOTNBI
Year Built
1963
Length
54.9 m (180.1 ft)
Max Span
28.7 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
8,689
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,321,000
Total Project Cost
$7,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.