US 1 NB/GL EDWRDS over I 95 SB

NEAR STADIUM EXIT · County 021, Massachusetts · Built 1963 · 2 Lanes · 16,494 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S090093PTDOTNBI
Year Built
1963
Reconstructed
2010
Length
83.5 m (274 ft)
Max Span
42.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
16,494
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,144,000
Total Project Cost
$10,717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.