HWY WASHNGTON ST over WATER NEPONSET RIVER

.4 MI S OF NORWOOD · County 021, Massachusetts · Built 1875 · 2 Lanes · 16,785 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
W030223KBMUNNBI
Year Built
1875
Reconstructed
1926
Length
11 m (36.1 ft)
Max Span
4.9 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
16,785
Material
Masonry
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,099,000
Total Project Cost
$1,649,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.