ST 1 A/MAIN ST over RR MBTA/CSX

.3 MI. N. OF ST27 · County 021, Massachusetts · Built 1900 · 2 Lanes · 22,500 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
W03013413DOT634
Year Built
1900
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
61.9 m (203.1 ft)
Lanes
2
Daily Traffic
22,500
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,215,000
Total Project Cost
$4,823,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.